Education Center
High Performance Model
| Washer 1st load of the day |
|
Remainder of the day is driven by the slowest piece |
|
Final dry of the day
|
|
|
|
|
|
| 25 minutes |
|
9 loads at 28 minutes = 252 minutes |
|
28 minutes |
Total equipment time to process 10 cycles = 305 minutes or 5 hours, 5 minutes
Loading or unloading time are not included.
Back
|