Education Center
Economy model
| Washer 1st load of the day |
|
Remainder of the day is driven by the slowest piece |
|
Final dry of the day
|
|
|
|
|
|
| 28 minutes |
|
9 loads at 44 minutes = 396 minutes |
|
44 minutes |
Total equipment time to process 10 cycles = 468 minutes or 7 hours, 48 minutes
Loading or unloading time are not included.
Back
|